Quarry Landfill Update for March 3, 2023.

Posted on March 3, 2023 at 1:35 PM by Joey Lamie

Work continues on Phase 2 of the Sidewall Odor Mitigation System (SOMS). The liner has been prepared for installation just past the southeastern corner of the landfill, reflecting significant progress on the SOMS.  Excavation is underway on the east wall to dig the trench for the lower SOMS collector. Additionally, piping of the vacuum laterals for the landfill wells has been reshaped to create a greater downslope for condensate collection.