Posted on March 10, 2023 at 3:12 PM by Joey Lamie
Work at the quarry landfill continued this past week. The field crew continues to trench around the quarry sidewall in preparation for the placement of the lower collector pipe. Trenching has advanced to the midpoint of the eastern quarry wall. The initial layer of rock has been added where the trench is completed and the crew has begun placing the lower collector pipe in the trench.