Posted on March 17, 2023 at 12:15 PM by Joey Lamie
Work continued this week on installing the lower collector pipe for the sidewall odor mitigation system (SOMS). Approximately two-thirds of the lower collector pipe (3,100 linear feet) is now installed in the landfill. Also this week, a liner crew started work to tie the SOMS into the existing liner and cover the lower horizontal collector trench. The locations for new wells at the landfill have been surveyed and marked.