Landfill Notifications and Information

BVSW logoCity of Bristol Virginia Landfill Information and Updates

View All Posts

Apr 07

Quarry Landfill Update for April 7, 2023.

Posted on April 7, 2023 at 10:10 AM by Joey Lamie

Work on the Sidewall Odor Mitigation System (SOMS) continued this week. The installation of the lower collector and lower liner is complete. Clay cover is being placed over the lower collector. Approximately 600 feet of the upper collector is installed. Eleven new gas wells have been drilled with vertical pipe and fill material installed in those wells. All of the new wells are capped. Drilling will continue next week through the southern end of the landfill and along the western wall.