Posted on April 28, 2023 at 11:14 AM by Rick Belcher
Steady work continues on the Sidewall Odor Mitigation System (SOMS). The majority of the upper collecting system has been installed. A 12-inch header system is being relocated to finalize this component of the project. Concrete and clay cover continues to be placed on the vertical rock face. Work is proceeding on the landfill gas collection system. All 18 chlorinated polyvinyl chloride (CPVC) wells, which are more resistant to degradation and have a longer lifespan, have been installed and have been placed under vacuum. Drilling of new stainless steel casing wells will be next in the process.