Posted on May 19, 2023 at 11:18 AM by Joey Lamie
Progress continues on the Sidewall Odor Mitigation System (SOMS). Clay is being placed on the southeast and eastern sidewall in preparation for additional liner that will be placed over the clay. The landfill gas system expansion continues with ten stainless steel wells installed. The new perimeter gas wells continue to be tested and calibrated to create optimal gas extraction.