Posted on November 16, 2021 at 11:57 AM by Joey Lamie
Work completed on Monday, November 15, included coordination with Ingenco to temporarily shut down the gas plant to allow tie-in to the existing system at 12” header gas line. Also moved 4” valve to the end of the new 12” header and tied in, tied 4” lateral gas line from GW34 and Gw35 into new 8” header line, performed air test on the 12” header line and laterals. Also installed air lines to the new wells (no pressure tests yet).