Posted on November 18, 2021 at 2:38 PM by Joey Lamie
Work completed on Wednesday, November 17, included installation of the road crossing for the 8” header line south of poly tank, place additional 8” header pipe, relocate the pipe and valve to allow for drainage to sump in south end of the landfill, and repaired existing well GW46.