Posted on November 26, 2021 at 6:46 PM by Joey Lamie
Work completed on Tuesday, November 23, included hooking up new header piping to the sump on the south end of the landfill, installation of wellheads on four wells (GW56, GW59, GW61 & GW 63) and setting the wellheads at 10% open to relieve gas pressure, and replacement of piping to wells GW46 and GW47 after filling was completed (was moved previously to allow the filling). These wells were reconnected to the system as per the previous set up.