Posted on December 1, 2021 at 2:39 PM by Joey Lamie
Work completed on Tuesday, November 30, included the installation of 175 LF of 8” piping and 611 FT of 4” piping. This piping was installed for connection of the gas wells in the central and southern portions of the landfill.