Posted on December 6, 2021 at 12:31 PM by Joey Lamie
Work completed on Saturday, December 4, included the installation of pumps in eleven of the gas wells located in the central and south part of the landfill for removing water that has accumulated in the wells. These pumps were installed, but will be operated by the O&M contractor when necessary.