Quarry Landfill Update for January 13, 2023

Posted on January 13, 2023 at 3:50 PM by Joey Lamie

Sidewall Odor Mitigation System (SOMS) construction continued this week. Concrete has been applied to the walls for the first 222 feet. SCS Field Services is currently placing dirt and stone in preparation for the placing of second perforated pipe (the first perforated piping was installed in mid-December). 

A graphic of the design for the Sidewall Odor Mitigation System can be found on the BristolVALandfill.org site under the Resources/FAQs section.